Bluegrass Power Generation LLC must obtain a Certificate of Environmental Compatibility and Public Need from the Ohio Power Siting Board to construct, operate, and maintain Bluegrass Power. The Ohio Power Siting Board requires electric generation facilities greater than 50 megawatt go through the standardized siting process for a certificate.
Multiple opportunities for public participation exist throughout the process, such as public comments through the Ohio Power Siting Board docketing system or at public meetings, signing up for case notifications, or directly contacting the Ohio Power Siting Board through the contact information provided below. The Bluegrass Power’s docket number is: 25-0227-EL-BGN.
Ohio Power Siting Board
180 E Broad Street, Columbus OH 43215
Phone: (800) 686-7826
Email: contactOPSB@puco.ohio.gov
Website: https://opsb.ohio.gov/home/